Hello everyone, I am trying to create a 2d Dashboard table similar to the image below. Would this be possible? If yes, can someone help with the JQL design for this. I need to call out current and future sprints in the top row. Also somehow show the planned delta columnG. The story points planned would be rolled up from EPIC-Link I imagine, then each sprint column points would come from preassiging stories into the future sprints. Thanks for the help and you'll be a life saver. Thanks
