This question is in reference to Atlassian Documentation: Editing a project
As we have over 200 Projects, one for each product we deliver (tied to one corresponding project in Bitbucket), is there any way to set the Default Review Duration for ALL existing or new projects in Crucible? Something like a system default? (Even if that means editing a system file on the server that will auto-populate that field for any new Project created from this point forward)
..really do not want to have to go through 200+ projects' settings and add the same time value.
Unfortunately, it's not possible at the moment. 24h default value duration is currently hard coded.
However, you can try to use REST API to automate things a bit, see
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.