Comments
-
Thank you so much :clap:
-
Today I saw this problem had happened for an issue and I fix it now by integrity checking as described here.
-
I think you can design this type of reports using EazyBI Plugin: https://docs.eazybi.com/display/EAZYBIJIRA/eazyBI+JIRA+Plugin+Documentation
-
Hi Gavan Please explain you request a bit more
-
Hi thanks for your plugin and I see it. But I need sum of Original Estimate in order to use it with BigPicture Gantt Plugin. Do you have any solution in order to copy the aggregated time to Original Estimate field s of Epics?
-
Thank you so much. It work for me using Yevgen suggestion.
-
Hi I solved this problem by entering JIRA Safe Mode, connect JIRA with Bitbucket and exit safe mode. If some one from Atlassian see this comment, it's better to share this workaround on KB.
-
Absolutely I need this now. I'm going to watch plugin for further updates. I think It's better to define an specific Issue link by the plugin and only support that link type for those issues.
-
Thanks to Atlassian support this problem has been solved by this workaround: What you do is open the activeobjects.xml file, and find and replace primaryKey="true" autoIncrement="false" to primaryKey="true" autoIncrement="true". Please assure you have a copy of the file in case something goes wrong.
-
I see this problem in following situation: 1- Drag and Drop (Re-rank) issue in Agile backlog 2- Create Sprint 3- Delete Issue I see it in this cases
-
This table belongs to JIRA Agile and I install a compatible version of it on my JIRA Instance.
-
Thanks for Comment. I try it and it didn't work
-
I think You choose a Date/Time picker for your custom filed type. Use Date Picker.
-
Hi Nader Install JIRA Suite Utility or JIRA Misc workflow extension plugin. This plugins add several new Validator to your workflows. Use Fields Required Validator and choose comment field in your Close Transition in order to write a comment.
-
I think this link is useful for people who have some similar issues: https://softwareplant.atlassian.net/wiki/display/COMPARE/Portfolio+management+comparison
-
Hi I have a suggestion but I'm not sure about if it's working or not. 1- Create a date/time custom field (For Example name it Start Date) and set it automatically in your transition from Todo to InProgress status. 2- Then create Scripted Field (ship with Script Runner plugin) and differ Issue resolution date from start…
-
Hi I have same problem. My main crowd running on 192.168.100.21 and I need an evaluation server behind this. when I import crowd xml backup of 21 into 29, I was not able to login. I open xml backup using e text editor and replace all 21s with 29 and the problem has been resolved.
-
Create a Issue security scheme for your project with one level. This level has been accessed by Assignee, reporter and your agents group. Set this security on Issue creation transition or manually by your agents. After assigning the issue to suppliers, just this 3 party able to see the issue: Assignee, Reporter and your…
-
Hi Nariman And for the last part of your question about change assigne, find your issues assinged to "Unassigned" user. JQL: assignee=unassigned And then choose bulk change (Top right corner of your issue navigator) in order to change all of them. Bulk change has bulk edit option. Thanks!
-
Thanks for your help, It worked for me too
-
Thank you for introducing SumUp! :)
-
Hi I think JIRA do every thing based on Issues and your calculated filed doesn't belong to any issue. I suggest this trick * Create New Project * Create a fake Issue - I suggest to name it project static data od something else * Create a calculated number filed(F1) and use your company conversion rate for week to…
-
Hi If you can explain why you need this, maybe get some good ideas without using your described methods.
-
Same problem Here!
-
Hi Joe If you explain your question, maybe someone able to help you.
-
Hi We have same problem and I agree that this is a bug. If you have 2 boards and at edit issue screen change sprint field value of an issue from board 1 with a sprint name from board 2 then an sprint will created automatically in board 1 with the same name at board 2 and every thing you do with one of this two namesake…
-
I had same error when connecting JIRA to Bitbucket server and Bamboo. I didn't have any user-installed plugins on Bamboo and Bitbucket. So I think it related to some JIRA plugins. Try it on a test server. Enter Safemode on JIRA and then reconnect it to confluence. It just took 5 minute.
-
Try my solution. It works for me.
-
Hi I solved this problem by entering JIRA Safe Mode, connect JIRA with Bitbucket and exit safe mode. If some one from Atlassian see this comment, it's better to share this workaround on KB.
-
I know it's plugin. it is Jitter but I can't understand what happened with it. Can you explain next steps?