Can someone provide the formula for the standard deviation (light blue shaded area) on a control chart? It is strange to me that it does not stretch equally above and below the mean like a true standard deviation calculation.
I think you are assuming a normal distribution, but with estimation, that is not the case.
The chance that a user story takes shorter than the estimate is lower than that it takes longer, so, therefore, the variability differs above and below the mean.
It looks like you're new here. Sign in or register to get started.