Good morning,
we would be able to calculate the sum of all original estimate time of sub-tasks to the parent story (to be able to plan the sprints and using reports). We checked the box that sub-tasks should be included in the calculation but both fields within the story are almost empty (undefined). All sum-fields of the story a calculated correctly.
Can we realize it withing standard JIRA or is it possible to use ScriptRunner to do that for us? Does anyone have scripted a solution for that?