Hello.
I've trying to understand how to link issues in JIRA, and I have found this linK:
https://confluence.atlassian.com/jiracoreserver073/linking-issues-861257339.html
But I am still trying to find a solution to my problem.
I have an epic, and this epic has 3 stories (story1, story2, story3).
I was able to link the 3 stories with this epic (I linked it: each story blocks the epic).
However, I wanted to be able to finish the epic, only if all the 3 stories are finished.
How can I do that?
This is, I want to link the 3 stories with the epic, so that it only be possible to finalize the epic after I finalize the 3 stories (in the workflow).
How can I acomplish this?