I refer to issue detail view and pressing the edit button to assign / change a sprint
When editing an issue only the sprint of the issues project is in should show up.
However, all sprints from all projects on the server show up which is error prone (assigning to the wrong sprint) and makes no sense.
And if I could paste a screenshot you could even see the visual proof of the problem
Therefore:
Is there a way to change the configuration so only the project specific sprints show up?
JIRA server 7.4.x