Hi,
I was wondering if it is possible to assign percentages to the phases (columns) in your kanban board.
F.e. If I have 4 columns (phase 1-4), is it possible to assign % to my flow, so I can see where my user story is ( percentage wise ) in my flow of phases? (E.g. if it is at the end of phase 2, it should be 50%).
Can you help me on that?
Thanks,
Jeroen