Hello!
Consider I have issues in my JIRA project. Some issues are resolved, some are not. Each issue has a complexity value (integer number) assosiated with it (I'm using Story Points for this).
I want to display overall project completion measured in those points, preferrably using Pie Chart diagram.
For example, if I have two issues, one complete with 5 points and one incomplete with 2 points, the completion rate should be: 71%.
Is it possible to do so?
Thank you.