I'm looking for the best way to have two estimates for a single issue.
This has come about as a result of our current set-up encompassing two teams. The first [Design] team usually creates and initiates the cards, and then passes the cards onto the [Ops] team to implement. Cards all share one workflow.
Each team holds separate triage and sprint planning sessions, and so it is necessary for each team to have accurate time estimates when looking at our Agile planning board. Unfortunately, what may be 2 points for the Design team could be 5 points for the Ops team, and so on.
So far the only 'workarounds' I can think of are:
1. One team to use 'estimate' and one team to use 'time tracking', and then setting up and maintaining two separate agile boards with each board displaying one method of estimate or time tracking.
2. Creating sub-tasks for each issue and having each team estimate the time needed in their respective subtasks. However, this is just an extra step for team members to remember to do.
If there are any other suggestions I would love to hear them. Also open to suggestions on how to better utilise JIRA, perhaps our current setup with single issues and a single workflow is not optimal.