Hi,
Currently our JIRA instance has around 48,000 issues. We are migrating from another issue tracking system to JIRA, and upon final cutover we will be having a total of 180,000 issues as of now. As per recent calculations, currently we have a growth rate of approximately 5,000 - 6,000 issues per month. Since Atlassian has recommended splitting up JIRA upon 200,000 issues, we are planning and studying the feasibility of doing so.
- Our database is hosted on a separate server. Does this help us to survive beyond 200,000 issues without splitting?
- If we split the instance, is it possible to make the split instances available on the same URL?
- One of our major concerns is that we often link issues belong to different projects. Can we maintain these links after splitting?
- If we split the instance, can we run both on the same physical host by just doing a memory upgrade?
- Is there a possibility to have two (or more) instances in sync and implement load balancing?
- If splitting is not feasible, what are the other options to keep a large sysetm stable?
Thanks in advance!
--
Shaakunthala