Hi
On the plan board, i can easily drag and drop existing stories on to the epics.
However, i now have some stories which were fixed in sprints which are now closed. And plan board does not display stories from closed sprints. So, i have no way to assign those stories to its corresponding epics.
How can i do that?.
To add to it, this is currently not possible via greenhoper, and it is a feature request
https://jira.atlassian.com/browse/GHS-7899
Any workaround to do so?
Rahul