In the RapidView, on the upper-left, there are three buttons:
Plan | Work | Report
I have not been able to set up a view in which the Plan button is enabled. Is that controlled by some specific filter setting (similar to how you have to have the Global Rank in the filter to be able to prioritize issues on the Task Board?)?