Had an issue in a sprint that:
- was initially un-estimated as far as story points were concerned.
- was given an estimate during the sprint (allocated a 3).
- was subsequently closed near the end of the sprint.
- was attributed to a version after closure (i.e. the fix version wasn't set initially either).
The problem is that the 3 points aren't being added to the sprint velocity for number of points completed in the sprint. Ideas why?