I have a epic - story - subtask triple. The subtask is assigned to me, but the epic and story are not.
My Scrum board shows the story and subtask in the swimlane of the epic, as expected. However, when I press the "Only my issues" filter, the story is greyed out (expected because it is not assigned to me) and moves to the "issues without epics" swimlane (not expected because the story is linked to an epic).
Why is the story listed under "issues without epics" when it is linked to an epic?