Hi all,
I have say a list I need to run through as a branch (say a list of fields or array value). I then want to create a work item for each one. The issue is I can't seem to be able to assign a user, I always get "user appears to be inactive".
The thing is though if I create the work item, then branch into it then assign it works. But I can't have a branch on a branch, so there is no way I can jump into the newly created ticket to do this.
I'd also love to do this with reporter too, but its less of an issue.
Thanks 