Hi,
I would like to validate the field Time Spent when I click on Log button click event in Log Work screen.
Using JIRA 6.2.3
--- Added on 22nd April
would like to validate the Time Spent duration.
Ex. 1. Log Work Time Spent per day should not go beyond 24hrs
2. User should not log Time Spent for Future days.
These are the things most common mistakes done by Engineers while filling Work Log.
I would like to control by using Validate Add-on(s).