Hi, in my repository lists, there is a column to shows the build status.
if the build is successful, then it will have a green checklist in that column.
I have set up the pipeline for 3 of my repositories. and all are having the build successful. but, in my repository list, its only 1 of the repository that is having the green checklist, while the other 2, dont have any checklist.