I love the new Epic left-hand pane view in the GH 6.1.x rapid boards. However, Story Points on an Epic don't seem to show up there. That is, if I edit an Epic and give it 20 Story Points, the view in the scrollable Epics list doesn't show those points. It only shows the summed points from the child stories.
Often I have, say, an Epic that has 3 stories under it that have been well defined and estimated, but additional work to be done on the Epic that has yet to be sliced out into Stories, so I end up with more points on the Epic itself. And, even more basic, sometimes I have an Epic that I want to estimate before I get to any story breakdown and definition. Shouldn't those points show up? Is there a place to configure this?
(Using JIRA 5.0.5 and GH 6.1.4.4)