The problem:
In the Agile Planning Board I cannot link a Story to multiple Epics using the drag and drop function, or by any other means for that matter.
The scenario:
There is a single back-end system that creates a product that is then distributed to multiple end-point systems for consumption by the "end-users". This means a single set of Stories to create the product then a separate story for distribution to each end-point as the solution may well be different.
The Epics are written from the "end-user" perspective to ensure the correct outcome-focused context. This means that the subset of the Stories, that deal with creating the product, are common to each Epic. I want to show that relationship on the Board but do not appear to be able to.
Any idea how i can do this?
Thanks