Hi,
I am on DC (not cloud) and unable to find out automation rule about sum in the case
Can we sum up "number" fields of all child issues and update parent's ?? (Not task and subtask, but with ParentLink and childLink)
Remember
- child A have number field = 12
- child B have number field = 10
- Parent issue (with parentlink, not task/subtask) = 22 (first time it is correct)
- This is fine so far but
- A : 12 -> 15 (updated)
- Parent Issue = 37 (not 25 like it should)
the problem is solved if we use tasks and subtasks = a solution exists
BUT
tasks and subtasks being limited to a single level (you cannot create several nested subtasks). As a result, it is possible, for a tree structure of this type, to use the principle of Parentlink/Childlink ; and therefore no more limit to a single sub-level but as many as desired
I've seen all of these answers (about "sum" pbl), which work great for task and subtask cases.
On the other hand, it is impossible to run a procedure correctly with the ParentLink / childlink. For these cases, we fall into the same process.
Do you have a solution for this type of case?
Thanks all.