Hello,
Seems our version of jira and greenhopper is missing the estimate field that, I thought, was part of jira out of the box. Or with greenhopper.
I am currently running jira 4.3.4 and greenhopper 5.6.5
I have looked in the default field configuration and I do no see estimate or work estimate in the list.
Any ideas? We really need this feature for upcoming sprint.
Thanks!
-Kip