I have four check boxes that are called EMP Local Backup, User Share, Email Mailbox, and Email Forwarding. I have validators applied so that when any combination of the first three are checked it then makes the Date Field Retention End Date. If the Email Forwarding is the only one checked it will require Date Field Forwarding End Date. If any of the first three and the email forwarding are checked it requires both.
My issue is that if I check any of the first three it is still requiring the the Forward End Date and if I only select Email Forwarding it is still requiring Retention End Date Field. Below is a screen shot of the code I have. I look forward to talking with you all.