Presently JIRA 5.2 is working on https and linked (application links) to confluence 4.3.7 using CA signed SSL certificates.
JIRA 5.2 is running on java 1.7.0.51 with working SSL certificates imported in trust store of confluence.
I want to upgrade JIRA from 5.2 to 7.1.6. However confluence 4.3.7 will stay on same version until end of this month.
JIRA 7.1.6 needs Java 1.8.
Now
Will JIRA 7.1.6 work with Confluence 4.3.7 with application links using existing certificates ?