Hi,
I added a new workflow with an additional (new) status to an existing workflow scheme within the active Sprint. The scheme is already used in many projects with multiple boards.
The new status, which I called “Ready” is assigned to the status-category “Done”.
But the status in current projects with the assigned workflow scheme isn’t automatically mapped to the category or the column. This status “Ready” always needs to be assigned manually.
Is it also possible to assign this new status "Ready" automatically to the Done column in all new and existing boards?
Thank you for any idea.
christina