Hi all, basically we have items we place into a sprint that we estimate with story points. That works all good and on the sprint report when the sprint starts it does have a max number of stories.
Now as I move it along the sprint it goes to "Test" at this point we want to call it in the sprint as complete (even though the item isn't). So we placed the Test on the right side at the end of the sprint. This then subtracts the number of story points in the report (all good).
This works fine so far, but then when we move it beyond test to say "into Production" or "Production Test" it then places those story points back in and says its no longer complete because its not in that final column anymore.
Is there anyway around this? Or would I have to place every item after "Test" into that final column? (For some reason Team really doesn't want to do it)