Hi,
I am currently using Jira 4.2. I have jira 4.2 database dump. I plan to do the following:
1. Import jira 4.2 dump into the new oracle 11g database.
2. Install Jira 5.1 and connect it to the database.
3. Copy attachments and custom plugins into the respective folder.
Should i do anything else to make this upgrade complete???
Thanks in advance..:):)