I'm currently using evaluation versions of JIRA Agile (6.4.2) and Confluence (5.7.3), and have been trying to migrate my very small initial dataset to a MySQL database (5.6.24). I have followed all the instructions on the site to the letter regarding xml backups, database installation, re-installation and setup.
The JIRA migration appears to have worked, but the Confluence migration comes a grinding halt at the re-import stage. The back up zip file is only 325KB, but after 40 minutes I pulled the plug on the import that had made 0% progress and was still initialising.
Is this an issue with an evaluation licence?
Thanks