We have a design team that is split into 2 teams that manage sprints from 8 other project work streams. I want to have a Design 1 project and a design 2 project letting both design teams work their own sprint and issues in their respected projects.
It has been suggested that we combine our projects into one project and run multiple sprints with different issues from all work streams for both teams in it. I think this would be Messy and a bit of a nightmare tagging issues associated to team 1 and team 2 then making multiple boards and so on.
Trying to figure out the pros and cons of working either way.
Any insights on why NOT or why we would even WANT to do this is appreciated 