how can i change field "estimate" on update issue priority in Jira
is it possible with jira plugin ?
Jira 6.4.
You would need to write a listener, which would listen to the update issue event. If you have Power Scripts or ScriptRunner plugin, then you can do it.
i have Script Runner 2.1.15
It looks like you're new here. Sign in or register to get started.