Hello
We are about to start a new project where we will be using Confluence and Jira to support a large mixed (Infrastructure & Software) system development. The organisation is a large traditional waterfall system engineering business, and this is its first foray into the agile world. But we have been using Jira for some time for issue management.
We are going to use confluence as a wiki / repository for all of the high level sources of information and then the generated high level requirements from the information sources.
At that point those requirements would be transferred to Jira to a) derived sub-system requirements and then b) manage the delivery of the products that meet the derived requirements using scrum.
I require some advice as to which way go for the Jira part. Do we create one project to do both requirements and delivery or do we create two projects one to derive the requirements and the other to deliver the products?
My concerns are if we use a single project how do we separate out requirement work from product work given the limited levels of hierarchy and maintain traceability back to up through the requirement tree..
Whereas if we use two projects how do I transfer over the derived requirements and also maintain linking back confluence for context. and requirement traceaability