For our JIRA project, we are trying to set up two Scrum Boards.
The First board would catch all of the JIRAs in Open, In Progress, and Ready.
The second board would then catch them as they flow from In Development, Testing, Resolved and Closed.
I've set them up this way and it seems to be working for the most part, except for one thing - it wont let us control sprints separately, which makes no sense to me. If I start a sprint on one board, it automatically starts it on the other with the same name. If I change the name it changes it on both boards.
Is there something causing this? Can I tweak something so I can have two separate sprints happening, one on each board?