When creating a subtask in Jira, it annoyingly doesn't inherit the default assignee as the parent card's assignee. Instead it falls back to the default assignee, which is usually the team lead.
This means, when folks are creating their own subtasks to track their work, most of the time those subtasks are assigned to the wrong person and have to be fixed.
Any way this can be fixed?