Hi all,
I've set up a project in JIRA. I want to see on all the time spent on each item and also a rolled up total time per epic.
Things I have tried:
- Configuration
- Have added users with permission to "work on issues" to enable time logging
- Have enabled the time-tracking feature in settings
- Ran Basic Time Tracking Report
- Logging time to issue types Story / Subtask / Task
- Running Time Tracker Report with no results
- Adding a Version
- Added an Issue & Subtask to a new version I created
- Selected that version in the TIme Tracker Report
- Still no results
Seems like a pretty basic function of reporting on logged time. I am a little stumped as to why this isn't working. Have I configured something incorrectly?
All feedback appreciated.