Hi - I have a JIRA reporting question.
We follow a flow where developer works on a ticket and then assigns to QA for testing and eventual release.
Now I want to find out workload report for developer post sprint completion, except that the assignees have changed (all QA now).
So I wrote a report with "was" operator. My query is something like this:
project = P and sprint = 1 and status was in (foo, bar) and assignee was in (a, b, c, d)
Now I can get the list of all the issues except that their assignees are the latest assignees. Is there a way to group issues by the assignee at the time (and show the assignee in that state)?
Is there a better way to solve the problem?