Hi,
Whenever there's an impediment / blocker to an issue, we would like to set the status of that issue to "Blocked" and once this is resolved, then change the issue status to "In progress". By this way, eventually we would like to get a metric as to how long the issue was in blocked state.
I understand that one can set the issue status to Blocked for a Kanban board. How to do the same for the Scrum board? How to include a "BLOCKED" swimlane, so that we can see the list of ticket which are in Blocked state through the Active Sprint view.
We are using the JIRA Cloud.
thanks
Robert.