I'm noticing a strange case when looking at the scheduling of empty epics (with no children stories). In the attached example I have 2 simple stages (50% allocation for each), and a single epic in my plan with 200 days work estimated.
When looking at this on the story level I can see the epic there as well (since it does infact have an estimate), but both stages are scheduled to happen simultaneously, and not in order, which is what I would expect.
How does this work?