I create a task (called Task1) and a sub-task (called Task2). Somehow the Issue Links of Task1 shows
blocks Task2
and the Issue Links of Task 2 shows
is blocked by Task1
Should the Task2 (which is a sub-task of Task1) be a blocker of Task1? Therefore, should the Link Issues indicated Task 1 is blocked by Task2 vice versa?