Steps to reproduce:
- Issue in a resolved status in project A (e.g. RESOLVED fixed)
- Move issue to Project B - status is not available
- Choose status in an unresolved state (e.g. OPEN)
Actual Result: Issue is in an Open state with resolution set (e.g. OPEN fixed)
Expected Result: Resolution is reset/purged.
Question:
How can I force the reset of resolution in the workflow?
I tried to reset in the POST Function of the target workflow to no avail.