The application link between stash and bamboo was set up successfully.
The stash repository was configured as global linked repository in Bamboo, and been used in build plans.
In bamboo builds, it could show stash relevant commits.
But there is no 'Builds' column shown in relevant Stash commits or build results from Bamboo.
The stash version is stash server 3.4.1, Bamboo version 5.6.2. I am integrate Stash and Bamboo according to 'Integration bamboo and stash'