Adding new version of specific project has been changed in a way that there is no more option 'Schedule' ( drop-down list ) to place it at desired location. In case that list of projects is very long then available method 'You can drag the new version to a different possition by hovering over the drag icon ...' is not useful.
Is it possible with some setting to have it back 'Schedule' drop-down list ?
Our previous Jira was 4.3.4 ( in manual on page 352 you can see instruction have to do it ), while in the latest 6.2.3 there is no such option ( official manual page 537 ).