I am using a Scrum Rapid Board.
By default, the Rapid Board creates swimlanes based on stories. This is great. It's easy to visualize in Work mode.
My problem is that as developers move sub-tasks to In-Progress, the base or parent story is always in Todo. I can't see how to move the base story into In-Progress without removing the story-based swimlane?
Ideally to me, if you move a subtask of a story into 'In Progress' the parent task is 'In Progress' as well. The Rapid Board Story Point counts are then off, because the base story (which has story-points) is never in progress. It just moves to done when the subtasks are done.