a can create tasks in confluence : a task list.
can I number them?
This is an out of the box answer without plugins.
You can do something similar to this:
However, a list is a list. So a numbered list vs a checkbox list is the same thing. You can't have both a numbered and check list on the same line, but the child line can be a checkbox list OR numbered.
Hopefully that gives you an option and clarifies some.
thanks, this is indeed an option
Another option is to...
If you do choose to go down this road, then I suggest that you prefix with letters (A-Z).
Yup... it's a hack.
no, thanks
Can anyone confirm that the ability to do this...to nest a task under each level of list item...is no longer possible in Confluence?
It looks like you're new here. Sign in or register to get started.