We have two field configuration schemes set up and assigned to various projects. We know realize we only need one. Is there a way to change the field configuration scheme accross multiple projects so we do not have to modify each project individually?
I don't think there is an option to do that.
Apart from using Script Runner and doing it from the Script Console. You should have scripting skils though.
It looks like you're new here. Sign in or register to get started.