I'm trying to switch a project's workflow scheme, but the second step is asking me to map the current statuses to new ones for every issue type we use in our instance, not just the types specified in the Issue Type Scheme for the project. I'd like to know why this is, and if there is a way to avoid it as we have a large number of issues types.
We are using JIRA server 6.3, and here is all the Atlassian documentation says about this step (Step 2 of 3: The current status of each issue needs to be changed so that it is compatible with the new workflows):
Each issue has to be in a valid status. The valid statuses for an issue are defined by its workflow. This means that when changing a workflow, you may need to tell JIRA the status for specific issues after the change.
Any feedback is appreciated.