With JIRA 4.4, the number of projects displayed in the projects drop down list from the projects tab was reduced from around 10 to 5. Can this be changed?
Hi,
That number is hard-coded to 5 in com.atlassian.jira.project.ProjectHistoryLinkFactory (constant MAX_RECENT_PROJECTS_TO_SHOW). So without some hacking (like recompiling this class on your own), I am afraid it cannot be changed.
Cheers,
Wojtek
OK thanks Wojciech.
Would be nice to get this as a configurable in the future.
It looks like you're new here. Sign in or register to get started.