We want to use time tracking in the following way:
1. A piece of work is identified and described and a time estimate entered eg 5d
2. A developer identifies part of the work in more detail and creates a subtask. He estimates this will take 2d. Instead of subtracting from the parent, the subtask is added. This the estimate for the parent should be either:
a) 3d if "Include subtasks is unchecked)
b) 5d if "Include subtasks is checked"
Also, the subtasks show as % complete but the length of time estimated is not displayed.
Can anyone help?