Hi all
I have a template with tasks. Kind of a timetable.

On the template only the difference between the dates matter. Task 2 is ten days later den Task 1 ...
Now I want a possibility to change all the due dates. Say I want to start the timetable on 01.11.2016. The result should be:
- 01.11.2016 ...
- 10.11.2016 ...
- 14.11.2016 ...
The same difference between 01.11.2016 and 01.01.2000 gets applied to all the due dates. Or according to the offset in brackets.
- Ideal would be, if the date gets asked on creation of the page.
- Or a button to change the date.
- Or an event listener which changes all the due dates automatically.
I think with the Scriptrunner Add-On this should be possible, but I don't know where to start ...
Thanks for any hints on this.
Reto