Something I keep running into: the field configuration says a field is required, everybody assumes the data is there, and then somebody builds a report on it and the numbers are nonsense.
The two failure modes i see are always the same. Required-on-create teaches people to type something to get past the dialog, so you end up with a due date that is technically filled and completely meaningless. And empty rich text counts as filled in most reports, because a description holding an empty paragraph node is not the same as null.
What i have not figured out is the right moment to look. Waiting until someone complains about a report is too late, but checking by hand every sprint does not survive contact with a real backlog.
Two questions for people running bigger instances than mine:
- do you have a routine for this, or is it always reactive?
- which fields actually turn out to matter? my guess is due date and assignee carry most of the weight, but that might just be my projects.