We have the following setup:
production [protected, merge via PR only]
master [protected, merge via PR only]
feature/x
bugfix/x
A feature/bugfix is added to via PR (requires 1 build + 1 approval) to master.
So everything in master is already approved and covered by build barriers.
Is there a way to allow PR from master->production to NOT require a redundant code review?
production must still be protected from direct writes or PRs that are not from master.